Taskerr verified providers
New on Taskerr — be one of the first to book

Longer copper and drain lines added when the outdoor unit must sit farther away.
Gas is recovered, new copper pipe is joined by brazing or flare, insulated and taped with the drain line, vacuumed, then gas is released and a leak test is done.
Price is labour for the joint; pipe per foot and any extra gas needed for long runs are added at the listed rates. Concealed wall chasing is quoted after a visit.