Taskerr verified providers
New on Taskerr — be one of the first to book

Old bathroom rebuilt: new tiles, waterproofing, concealed pipes, fittings and ceiling.
Old tiles and fittings are removed, pipes are renewed inside the wall, the floor is waterproofed, new wall and floor tiles are laid, and commode, basin, shower and accessories are fitted. Packages include materials of the listed grade; geyser and mirror cabinet are extra.
You choose tiles and fittings from samples after the site visit. A bathroom takes 7–12 days; another toilet in the flat should be usable meanwhile.