Taskerr verified providers
New on Taskerr — be one of the first to book

Wall-mounted electric geyser fitted with inlet, outlet, safety valve and a dedicated power point.
The plumber drills and mounts the geyser on a strong wall, connects cold inlet and hot outlet lines with flexible pipes, fits the pressure-relief valve and drain, and the electrician wires it to a suitable switch and MCB, then fills and tests it.
Takes 1.5–3 hours. Extra pipe runs, new wiring from the board, wall tiles repair and brackets for weak walls are charged separately. The uninstall option removes and caps the old unit.