Taskerr verified providers
New on Taskerr — be one of the first to book

Kitchen rebuilt with new tiles, worktop, sink shifting, gas and water lines and cabinets.
The old slab and tiles are removed, water and drain lines are reworked (sink shifted if needed), a new worktop and wall tiles are fitted, sockets are added and cabinets installed as per package. Materials of the listed grade are included; appliances and gas line approvals are extra.
After measuring, you get a 2D layout and item-wise quote. Kitchen work takes 10–20 days depending on cabinets.